What At Risk Means for Tonight
Some students see “At Risk” and panic. Some parents think the child has already failed. Some teachers wonder if the app is giving a WAEC grade. That is not what the label is for.
On Olearna, a subject can show On Track, Improving, or At Risk. The labels help you plan study after a diagnostic and practice. They are not WAEC grades, not school report comments, and not a promise about the final result.
At Risk
At Risk means this subject should take the next evenings before the others. It does not mean “give up.” It means the weak topics are still open, so a random past paper will keep punishing you.
Tonight: open that subject. Do one topic. Check the ones you missed. Stop when your timer ends. Three evenings like that beat one long panic night.
Improving
Improving means you are moving, but a gap is still there. Keep it on the week plan. Do not let it steal every hour from an At Risk core. Two shorter sittings can hold the gain.
On Track
On Track means that subject can wait while you repair something else. Light practice is fine. Using all weekend on On Track is how At Risk subjects stay At Risk.
Where the label comes from
A free diagnostic can give a first signal with no account: free diagnostic. With an account, practice and review update the picture. The full method is on the method page.
More on the labels: how to use readiness labels.
Takeaway
Treat At Risk as the order of work for tonight, not as who you are. Write the subject, open one topic, check the miss, sleep. Tomorrow the label can move. Panic will not fix it.